Go to the HMS group website
grouphms.com
Sibneftemash
+7 (3452) 53-50-50
+7 (3452) 76-26-00
Callback
RU
/
EN
Company
  • History
  • Licenses and certificates
  • Company management
  • GMC group
  • Information disclosure
  • Reviews
  • Partners
Production
  • Equipment for batching, storing and transporting of cement mixtures
  • Well workover equipment
  • Hydraulic fracturing equipment
  • Drilling equipment
  • Tank equipment
  • Pressurized vessels
  • Block-complete equipment
  • Frame-panel buildings
  • Packer and anchor equipment
Oil field service
Illiquid selling
Press-center
  • News
  • Video
  • Mass Media about us
Gallery
Career
Contacts
    Сибнефтемаш
    Company
    • History
    • Licenses and certificates
    • Company management
    • GMC group
    • Information disclosure
    • Reviews
    • Partners
    Production
    • Equipment for batching, storing and transporting of cement mixtures
    • Well workover equipment
    • Hydraulic fracturing equipment
    • Drilling equipment
    • Tank equipment
    • Pressurized vessels
    • Block-complete equipment
    • Frame-panel buildings
    • Packer and anchor equipment
    Oil field service
    Illiquid selling
    Press-center
    • News
    • Video
    • Mass Media about us
    Gallery
    Career
    Contacts
      ГМС группСибнефтемаш
      • Company
        • Назад
        • Company
        • History
        • Licenses and certificates
        • Company management
        • GMC group
        • Information disclosure
        • Reviews
        • Partners
      • Production
        • Назад
        • Production
        • Equipment for batching, storing and transporting of cement mixtures
          • Назад
          • Equipment for batching, storing and transporting of cement mixtures
          • «UPTR» Unit
          • «UОP-20М» Averaging mobile unit
          • Cement bulk truck 58743-0000010 «ACT-17»
          • Cement truck «CT-25» (special semi-trailer 99682-10)
          • Mobile cement warehouse, «CT-40» (special semi-trailer 99683)
          • Moblie unit «МК»
          • Mobile warehouse «ZCM»
          • Strainer filters (stone trap)
          • Tubular dust collector filter «FR-30»
          • Chemicals loading hopper «BHR»
          • Loading hopper (cutting bottle), «BP-5»
          • Silos for cement slurry collection, combined with a tubular dust collector filter «1STС-15D»
          • Cement silos, «SC»
          • Stationary non-pressurized cement warehouses
          • Stationary pressurized cement warehouses
        • Well workover equipment
          • Назад
          • Well workover equipment
          • Cable coiling and uncoiling Unit «UNRK-2000»
          • Cleaning container «OEK» (special trailer 8962, 8973)
          • Trip tank «EDK» (special trailer 8962, 8973)
          • «POTOK-40» Unit
          • Tool storage workshop with test tank «PMD»
        • Hydraulic fracturing equipment
          • Назад
          • Hydraulic fracturing equipment
          • Vertical gel reservoir «VGE»
          • Hydration unit
          • Reservoir «PTE»
          • Proppant bunker «PB»
        • Drilling equipment
          • Назад
          • Drilling equipment
          • Brine preparation station «MSS»
          • Circulation system
          • Drill fluids preparation unit
        • Tank equipment
          • Назад
          • Tank equipment
          • Horizontal steel double-walled tanks «RGD»
          • Horizontal steel tanks «RGS»
          • Horizotnal unverground drainage tanks «EP», «EPP»
        • Pressurized vessels
          • Назад
          • Pressurized vessels
          • Vertical vessels
          • Horizontal vessels
          • Free water knock out
          • Gas separators GS
          • Oil-gas separators, NGS-type
          • Oil-gas separators, NGSV-type
          • Pressurized vessels
        • Block-complete equipment
          • Назад
          • Block-complete equipment
          • Блок фильтр-коалесцеров
          • Блок фильтр-сепаратора
          • Блок буферных емкостей
          • Блок сепаратора факельного
          • Блок разделителя тяжелого конденсата
          • Блок разделителя
          • Блок осушки попутного нефтяного газа и регенерации триэтиленгликоля
          • Блок конденсатосборника
          • Блок колонны регенерации метанола
        • Frame-panel buildings
          • Назад
          • Frame-panel buildings
          • Здание гаража
          • Здание склада материалов
          • Здание ремонтных мастерских
          • Здание укрытие
          • Здание сооружений производственно-ливневых стоков
          • Здание насосной станции противопожарного водоснабжения
          • Здание манифольдной
          • Здание станции насосной внешней перекачки нефти
        • Packer and anchor equipment
          • Назад
          • Packer and anchor equipment
          • Mud bucket «YuP»
          • Pup joint
          • Tubing collar
          • Фильтр щелевой для насосно-компрессорных труб (НКТ)
          • Tubing crossover
          • String pressure testing crossover POKT
          • Safety joints PB-GT, PB-GZ
          • Safety joint PB-MN
          • Safety joint PB-MV
          • Bottom-hole cleaning equipment UOZS
          • Компенсатор
          • Клапаны сбивные КС
          • Клапан обратный двусторонний КО-Д
          • Valve KCS
          • Stream splitting valve KRP
          • Bypass valve KP
          • Valve KCO-KV
          • Circulation valve KC
          • Tubing disconnector 2RK-MP
          • Tubing disconnector 2RK-GT
          • Hydraulic anchor with cable duct 5YaGM-KV
          • Hydraulic anchor 5YaGM
          • Hydraulic pacher 2YaGM
          • Mechanical anchor with cable duct YaMD-KV
          • Mechanical anchor with cable duct YaMV-KV
          • Mechanical anchor with cable duct YaMN-KV
          • Mechanical anchor YaMD
          • Mechanical anchor YaMV
          • Mechanical anchor YaMN
          • Packer POM-Ch
          • Пакер гидравлический с клапаном-отсекателем 2PD-KO
          • Hydraulic packer PG-YaG
          • Hydrauilc packer PGK
          • Hydraulic packer PGI
          • Hydraulic packer 2PD-YaG-3М
          • Hydraulic packer 2PD-YaG-2М
          • Setting tool 2УП
          • Drillable packer with valve PRK
          • Drillable packer PR
          • Mechanical packer 5POM-U-YaGK
          • Mechanical packer 5POM-U-YaG
          • Mechanical packer 5POM-U-YaM-KV
          • Mechanical packer 5POM-U-KV
          • Mechanical packer with cable inlet 5POM-KV
          • Mechanical packer 5POM-U-YaMF
          • Mechanical packer 5POM-U-YaM
          • Mechanical packer 5POM-YaMF
          • Mechanical packer 5POM-YaM
          • Mechanical packer 5POM-YaGK
          • Mechanical packer 5POM-PK
          • Mechanical packer 5POM-2YaGM (5YaGM)
          • Mechanical packer 5POM-YaG
          • Mechanical packer 5POM
          • Mechanical packer 4POM-U
          • Mechanical packer 3POM-U
          • Mechanical packer 2POM-YaGK
          • Mechanical packer 2POM-YaG
          • Пакер механический 2ПОМ
          • Mud Bucket «YuP»
      • Oil field service
      • Illiquid selling
      • Press-center
        • Назад
        • Press-center
        • News
          • Назад
          • News
          • News
          • Video
          • Mass Media about us
        • Video
        • Mass Media about us
      • Gallery
      • Career
      • Contacts
      • +7 (3452) 53-50-50
        • Назад
        • Телефоны
        • +7 (3452) 53-50-50
        • +7 (3452) 76-26-00
        • Callback
      Tyumen region, 15 km of Tobol road
      snm@sibneftemash.ru
      • Facebook
      • Instagram
      • Main
      • About
      • History

      History

      July, 2011

      JSC Sibneftemash is a part of HMS Group OJSC.

      HMS Group OJSC is one of the largest manufacturers of pumping equipment for the oil and gas industry, energy, housing and utilities, and water management in Russia and the CIS, one of the leading manufacturers of block-integrated oil-field equipment, as well as a dynamically developing engineering company that performs a wide range of design , construction and commissioning works on the complex arrangement of oil and gas facilities and water management facilities.

      2006

      The first technological capacity of 75m3 - PTE-75P was released.

      2003

      The first cement plant was launched, as well as a mobile cement warehouse TsT-40

      2001-2006

      The company allocates significant funds for modernization.

      The boiler room, machining shops, assembly and welding shop, paint shop were reconstructed.

      The high-performance modern equipment is installed.

      2000

      The beginning of the formation of the range of products that today characterize the main product line of JSC Sibneftemash:

      • packer-anchor equipment;

      • containers

      1994-1995

      AO Sibneftemash produces 178 cementing pumps.

      In the future, 9T was upgraded by factory workers, and was produced as a pump TsN 26-32. Over the next few years, dozens of new products were launched into production:

      1. welding units (on the basis of a TT-4 skidder);

      2. container gas stations;

      3. underground drainage tanks;

      4. autoloader cable;

      5. gearboxes intermediate to pumping units;

      6. drives screw pumps;

      7. steam boilers for installation PPUA-1600/100 and others.

      1993 - New stage in the history of the plant

      The plant was incorporated, and, like thousands of enterprises in the country, it suddenly turned out to be in the element of the market. The demand for previously manufactured products, which were highly valued by the oil industry, fell catastrophically. A sharp decline in investment in the oil industry, and competition. Now, not only domestic but also foreign firms vied to offer their products.

      JSC Sibneftemash will repurpose production and begin production of 9T pumps (before that, the only enterprise that produced this equipment was the Krasny Molot plant in Grozny, but it stopped work).

      November, 1989

      The plant is mastering the serial production of pumping units, which were previously produced by the Baku plant.

      The equipment park is replenished - the plant receives more than 20 long-awaited machines for various purposes.

      1987 – A special milestone in the history of the team

      The plant goes to the new department - the Ministry of Petroleum and Chemical Engineering, and receives the name Sibneftemash, which is still preserved.

      With the change of signage, there was a change of priorities in the product range. The main thing for the enterprise is the construction of block-type pumping stations (BKNS).

      1980

      More than 400 people work at the plant.

      Products of this period:

      • semi-trailers and saddles;

      • ramp and oil barges;

      • float cranes;

      • floating block pumping stations;

      • pipe carriers, timber trucks and fuel trucks;

      • heat generators for prestarting heating of automotive engineering, etc.

      The company is transferred from the category of auxiliary to an industrial group and gets the name "Neftetransmash". New buildings are being introduced, the machine park of the plant is being replenished. The volume of production increases significantly.

      The range of manufactured products is replenished:

      • swamps and dredgers, so necessary in the swampy Tyumen taiga,

      • SP-49A pile-driving machines,

      • gas heat generators TGP-1,

      • mobile non-destructive testing laboratories and other innovations.

      March  19, 1976

      Created "Mechanical plant for the production of auto equipment," according to the order number 163 "Glavtyumenneftegaz." At that time, Glavtyumenneftegaz was headed by the legendary V.I. Muravlenko.

      The purpose of its creation was the operational provision of special and non-standardized equipment of oil and gas companies in Western Siberia.

      It was a difficult task:

      • In the period of development of the oil and gas complex of the country, Glavtyumenneftegaz was to quickly increase the production of Tyumen oil at the expense of the relatively small new underground “storerooms” put into development.

      • Many dozens of oil-bearing areas located in the marshy taiga, far from each other, as well as from industrial bases and transport routes, needed equipment, fuel, building materials to develop new fields and develop the necessary infrastructure.

      • History
      • Licenses and certificates
      • Company management
      • GMC group
      • Information disclosure
      • Reviews
      • Partners
      Company
      History
      Licenses and certificates
      Company management
      GMC group
      Information disclosure
      Reviews
      Partners
      Production
      Equipment for batching, storing and transporting of cement mixtures
      Well workover equipment
      Hydraulic fracturing equipment
      Drilling equipment
      Tank equipment
      Pressurized vessels
      Block-complete equipment
      Frame-panel buildings
      Packer and anchor equipment
      Oil field service
      Технология
      Оборудование
      Инжиниринг
      Услуги
      Патенты
      Заказчики о нас
      Бортжурнал
      Контакты
      Illiquid selling
      News
      Video
      Gallery
      Career
      Contacts
      HMS Hotline
      Disclaimer
      Privacy Policy
      Our contacts

      +7 (3452) 53-50-50
      +7 (3452) 76-26-00
      Mon – Fri: from 9:00 to 18:00
      Tyumen region, 15 km of Tobol road
      snm@sibneftemash.ru
      © 2023 All rights reserved.
      Site development